Cooling is one of the essential engineering systems in a modern building. During the warmer months, it plays an important role in creating a comfortable indoor environment, maintaining air quality and supporting workplace productivity. A properly designed cooling system helps distribute cool air evenly throughout a space, operates efficiently and reduces long-term costs by lowering energy consumption.

GreenClimat provides a complete cooling service, covering the entire engineering process - from system design and installation to ongoing technical maintenance. We work with residential, commercial and industrial properties, including apartments, private houses, offices, restaurants, hotels, shopping centres, industrial facilities and medical institutions.

What Is Cooling and How Does It Work?

A cooling system is an integrated engineering system that removes heat from indoor spaces and transfers it outside through the circulation of refrigerant or chilled water. It may include outdoor and indoor units, a piping network, a condensate drainage system and control automation. More complex projects may also involve chillers and fan coil units.

Modern cooling is no longer simply an air conditioner installed in a window. It is an intelligent system that:

  • Controls the temperature in each room through a centralised control system.
  • Automatically adjusts its output according to the building's actual cooling demand (Inverter technology).
  • Works in coordination with the heating system as part of an integrated HVAC approach.
  • Filters dust, bacteria and allergens from the air.
  • Integrates with Smart Home platforms.

Types of Cooling Systems

The choice of cooling system depends on the building's area, the number of rooms, architectural features and budget. We install several types of systems:

Split Systems

A traditional and widely used cooling solution for apartments and small offices. The system consists of one outdoor unit and one indoor unit. It is ideal for spaces with one or two rooms where independent temperature control is required.

Multi-Split Systems

One outdoor unit serves 2–5 indoor units. This is an ideal solution for apartments and private houses where installing multiple outdoor units on the building façade is undesirable. Each room can be controlled independently.

VRF / VRV Systems

Professional cooling solutions for large spaces, including offices, hotels and business centres. A powerful outdoor unit serves 10–50 indoor units using variable refrigerant flow technology. When properly selected, the system helps improve energy efficiency and enables centralised temperature control.

Chiller–Fan Coil Systems

Cooling based on chilled water - an excellent choice for very large facilities such as shopping centres, hospitals and factories. The chiller produces chilled water, while fan coil units distribute it throughout the building.

Cassette and Ducted Air Conditioners

Cooling systems designed for concealed installation. The indoor unit is installed above a suspended ceiling, with only the ventilation grille visible in the case of cassette systems. They are ideal for spaces where interior design is a priority, such as boutiques, restaurants and premium apartments.

Cooling Solutions for Different Types of Properties

Residential Cooling

Cooling an apartment or private house requires a balance between comfort, noise levels and energy costs. We select Inverter-type equipment that operates quietly and consumes less electricity compared to conventional models.

Commercial Cooling

Offices, restaurants, cafés, shopping centres and fitness centres each have specific requirements for temperature and air exchange rates. We install VRF and cassette systems with centralised control.

Industrial Cooling

Cooling in industrial facilities is often critical both for personnel comfort and for technological processes, including in server rooms, warehouses and production facilities. We install chillers, industrial air-conditioning units and closed-loop cooling systems.

Cooling System Design

An efficient cooling system starts with a well-prepared design. Our engineers calculate:

  • The building's heat load (W or BTU/h), separately for each room.
  • The impact of solar exposure, including window orientation and façade characteristics.
  • The number of people and their activity levels.
  • Heat generated by equipment, computers and lighting.
  • The recommended capacity of air-conditioning units or chillers.
  • The refrigerant or water circulation layout.
  • Condensate drainage routes.

Design work is carried out in accordance with applicable building standards and regulations (СНиП, ASHRAE). We provide clients with a complete set of technical drawings, including the general layout, axonometric diagrams, detailed connection drawings and material specifications.

Coordinating Cooling with Other Engineering Systems

Cooling systems rarely operate in isolation. In a real-world project, they must be coordinated with the building's other engineering systems:

  • Heating - integrated within a unified HVAC concept, often using shared equipment such as a heat pump.
  • Ventilation - synchronising the supply of fresh air with the circulation of cooled air.
  • Water Supply and Sewerage - ensuring proper condensate drainage.
  • Fire Protection Systems - ensuring that mechanical rooms comply with safety requirements and integrating fire dampers.

An integrated approach ensures that all systems - heating, cooling and ventilation - operate efficiently, safely and economically in coordination with one another.

Cooling System Installation Stages

  1. Site inspection and measurements - assessing the area, ceiling height, window orientation and thermal insulation.
  2. Heat load calculation - calculating the required cooling capacity for each room individually.
  3. System selection - choosing a split, multi-split, VRF or chiller system.
  4. Design and specifications - preparing drawings, equipment lists and cost estimates.
  5. Installation - installing indoor and outdoor units, refrigerant piping and electrical connections.
  6. Vacuuming and refrigerant charging - ensuring the system is properly sealed.
  7. Commissioning and testing - checking cooling and heating modes, where applicable.
  8. Handover - providing operating instructions, warranty information and a maintenance schedule.

Why GreenClimat?

With more than 15 years of experience, we understand the specific conditions of the Georgian market, including local climate conditions, building types, available equipment and energy tariffs. We are the official representative of Daikin, the world's No. 1 HVAC brand, in Georgia. We provide installation warranties and ongoing technical maintenance.

Request a Consultation

Frequently Asked Questions

  • The cost of a complete cooling system depends on the building's area, the selected technology (split, VRF or chiller) and the equipment brand. A standard split system for an apartment is a relatively affordable option, while a VRF-based cooling system for a large facility requires a significantly greater investment. The exact cost is determined after a site inspection and the necessary technical calculations.

  • Inverter-type systems are generally among the most energy-efficient options in operation. They adjust their operating frequency according to cooling demand and can consume 30–50% less electricity than conventional air conditioners. VRF systems are often the most efficient choice for large facilities.

    • Standard split system: 1 day.
    • Multi-split system: 2–3 days.
    • VRF system for a medium-sized office:  1–2 weeks.
    • Chiller–fan coil system for a large facility: 3–6 weeks.
  • Yes. Modern cooling systems can operate in Heat Pump mode, meaning the same equipment can provide cooling in summer and heating in winter. This is particularly useful in Georgia's climate.

  • A full preventive maintenance check is recommended at least once a year, before the start of the cooling season (April–May). Filters should be cleaned every 2–3 months. Refrigerant levels should be checked every 1–2 years.

    Looking for a cooling system for your property? Contact us for a free consultation.